The Project - To refurbish the existing ticket office on the west side of the bridge, including the removal of the existing glass walling, sand blasting the existing frame, installation of a new entrance and reception area (including secure lockers and photo wall), repairs to the existing terrazzo flooring, new glazing throughout, new signage, DDA alterations, and new decorations.

The Challenge - To carry out the programmed works with little or No disruption to the client, their staff and the general public (with the exception of the west walkway three week planned closure, for the external cladding / entrance works), to ensure that the construction works ran as smoothly as possible for everyone concerned.

The Result - The project was completed as programmed, with the final result and the client being extremely happy with the final results.